Our Work

Call us at 303-856-6312 to discuss your bath, kitchen, or tile project

Try zooming in to see larger photos.

 

 

 

 

 

 

Dakota Ridge

Frasier Meadows

Noble Park

Martin Acres

Old North Boulder

Lafayette

Noble Park

Step by step photos.

Old corner shower in a small condo bathroom.
Old shower.
Sometimes we find mold, leaks whatever you can think of. In this case we demo’d the area and treated for mold/mildew before proceeding.
Walls sealed with Redgard. Custom floor will be sealed also. Getting started up the wall with a 4 x 16 subway tile.
Accent tile.
Finishing out the tile setting process. Grout next.
Floor going in.
Wrapping up.
Sink cubby to the right of the shower.
Finished out beautifully!
Custom tile shower floor.
And where the floors meet up we have tight grout lines and smooth finish.
Old Shower.
Getting Started.
Hardibacker sealed with Redgard.
Going up with marble and accent tile with built in shelves.
Basket weave accent.
Accent and Built In shelves.
White grout.
Wrapping up.
Wrapping up.
Old shower and Jacuzzi.
Old shower pan.
Old Jacuzzi.
Demolition under way.
More demo.
Damaged sub floor.
Going up with a new shower.
Hardibacker for new floor.
9.5 x 37.5 inch floor tile going in.
Custom Shower Pan poured.
All joints sealed with cement. Redgard is next.
Custom tub going in on new floor.
Tub and floor from entry
View from entry with floor and tub in.
Tile going up.
Custom marble AND Custom pan.
Trimming out the built ins.
Bringing tile up the wall and around the built ins.
Ready for glass.
Trim details around the tub area.
Tub area.
New tile through the water closet.
Details around the built ins.
Trim details.
Finished. Ready for glass. We do beautiful bathrooms.
Walked into this on a Monday morning. The bathroom has been torn apart due to mold remediation. Major structural and plumbing work required on this one.
Getting the floor back together and getting the plumbing in.
Tub set and Hardibacker in.
Tile going in and around window.
New floor.
New toilet, vanity, sink, and faucet.
Finishing out
Close up of tile and fixtures.
TIle.
We also clean and re-grout showers. Old on left vs. new on right.
Cleaning and resealing grout.
Cleaning and resealing grout.
We do work with all budgets. On this bathroom we took up old tile and installed vinyl plank. For finishes we replaced the sink, vanity, and faucet and kept everything else.
New floor and vanity.
New floor, vanity, sink, and faucet.